Home / Factory and process automation / Energy, material and waste

Energy, material and waste optimisation

Power, raw material and scrap are often the biggest costs a plant can still control. We measure them per machine, per batch and per unit, find where they leak, and help you cut them.

An electrical panel with energy meters for each machine
What we do

What we do

Power metering

Energy meters per machine or line, so you see consumption per unit made and spot machines running idle.

Peak demand control

Spreading heavy loads so your maximum demand, and the charges that come with it, stays down.

Material consumption

Actual versus standard consumption per batch, linked to the bill of materials in your ERP.

Scrap and rework

Recording scrap at the machine with the reason, so the biggest causes are fixed first.

Predictive maintenance

Vibration and temperature trends that warn before a breakdown wastes material and machine time.

Cost per unit

Power, material, labour and machine time combined into a true cost per unit, by product.

Sorted metal offcuts beside a press fitted with a sensor
Waste

Scrap counted at the machine, with the reason

When scrap is recorded where it happens, with the cause, the biggest sources show up within weeks and get fixed first. Material saved is money saved on every batch.

How we work

From first call to go-live

Day-one baseline
Meters and sensors
Consumption analytics
Fix the top leaks
Track savings monthly
Technologies

Tools and platforms

Energy metersIoT sensorsTime-series databaseERP bills of materialsPower BIGrafana
Questions

Questions

How soon do we see savings?

The first leaks usually show within weeks of the meters going live. The gain is tracked against the baseline we record on day one.

Start with a visit to your plant

Tell us what you run today and where time is lost. One or both founders will come and look, and tell you honestly what is worth doing.